This model name is typically abbreviated (uniquely) for use in node references. For example, the name of the Manufacturing Operations model might be abbreviated as MFG. For a discussion of node references, see Section 3.3.4.3. 3.4.6 Presentation Rules When there is text, it should accompany the corresponding graphic diagram. In unpublished models, a glossary specific to a particular graphical diagram should accompany the diagram and define only the key words, phrases, and abbreviations used with the particular node. In published models, the glossary section defines key words, phrases, and abbreviations for the entire model, arranged alphabetically.
It should be presented in the form of a tree of nodes algeria whatsapp number data or a list of nodes and contain node numbers, diagram names, and block names. Appendix A of IDEF0 Concepts A.1 Background The Air Force's desire to reduce costs and lead times by assisting the aerospace industry in its modernization efforts is exemplified by numerous "Tech Mod" programs. A similar goal, but using an industry-wide base rather than individual companies, was pursued by the Integrated Computer Aided Manufacturing (ICAM) program. The goal of ICAM was to develop "universal subsystems" that could be used by a large number of companies to provide significant industry-wide modernization.
These "subsystems" provide support for such common functions as information management, shop floor scheduling, and materials handling. To achieve this ambitious goal, a common “base” communications framework was needed around which subsystems could be planned, developed, and implemented in individual aerospace companies. The initial framework was called “Production Architecture” because it was intended to provide an industry architecture that showed how industry works today and what generic subsystems could be planned, developed, and implemented. Developing an architecture requires a “language” in which to express ideas and document ongoing operations in the aerospace industry. At the beginning of the ICAM program, the Air Force issued a request for proposals for an architecture.
If a table of contents is provided for the model
-
- Posts: 104
- Joined: Tue Jan 07, 2025 4:40 am