Knowing and understanding the client's goals and requirements makes it easier to achieve the desired result. At this stage, it is necessary to find out all the features of the final product and draw up a technical specification that can be used as a basis for its development.
Step 5: Plan the Sprint
The entire technical task of the product owner is not subject to planning in full. The work is divided into cycles and each subsequent sprint is planned based on the results of the previous one.
Step 6: Continuously analyze and evaluate the result
In Scrum, it is important to be able to summarize and react flexibly to the need to netherlands mobile database change the product backlog. Only a fully finished product or part of the product (depending on the plan) can be considered a positively completed sprint and move on to planning the next cycle.
These six simple steps will help a company switch to Scrum and increase the productivity of the team's actions with less time and energy expenditure. Are there really no difficulties when implementing this methodology? The answer is obvious: as in any process, errors can be present here too. To avoid undesirable consequences and release a quality product using Scrum methods, it is necessary to rely on the experience of real developers.
Step 4: Create a list of product requirements
-
- Posts: 461
- Joined: Mon Dec 23, 2024 5:30 am