Step 2. First, the vertical slats are installed, and then the horizontal ones are placed between them.
Step 3. The guide rail is cut to the required length.
Step 4. Mark the locations of future georgia mobile database fastenings. Marks are placed every 60-80 cm.
Step 5: Use a 6mm drill to make holes 5-6cm deep.
Step 6. Installation of the lathing begins with the corner posts.
Step 7. The slats are laid as follows: one at knee level, the second at the hip, the third at the shoulder. It is worth keeping the interval between the bars about 50 cm.
Installation of the frame (without insulation)
Step 8. Do not tighten the screws too much right away. First, the guides are baited with plastic dowels.
Step 9: Before installing the rail, you need to make sure that it is level.
Step 10. The rail is hammered in with a dowel, which can then be tightened with a screwdriver.
For the dowel, you need to use a plastic attachment that fits tightly into the hole by at least 30 mm.
Do-it-yourself paneling of a balcony from the inside
-
- Posts: 521
- Joined: Sat Dec 21, 2024 3:33 am