Preparation of tools and materials

A comprehensive repository of Taiwan's data and information.
Post Reply
zihadhosenjm40
Posts: 521
Joined: Sat Dec 21, 2024 3:33 am

Preparation of tools and materials

Post by zihadhosenjm40 »

The next step, if you plan to work with wooden paneling, is to dry it. PVC and MDF panels do not need this manipulation. To prevent wooden paneling mounted on the ceiling from deforming, it must be thoroughly dried on a horizontal surface. The minimum drying period is 2 weeks, but a longer interval is also allowed. If you do not want the wooden ceiling paneling to lose its presentable appearance soon, drying cannot be neglected.

To install the lining on the ceiling as quickly as possible, it is worth bc data brazil in advance all the tools that may be needed during the work process:

a hammer drill with a drill bit with a cross-section of 6-7 mm (if you are working on a concrete ceiling), or an impact drill;
screwdriver;
electric jigsaw or hacksaw (tools are suitable for any type of lining);
level;
roulette.


In order to cover the ceiling with clapboard, it will be necessary to purchase a number of auxiliary materials.

Since the lining is attached to the frame, that is, the lathing, it is necessary to select the type of material for it:

Wooden slats - they are best suited for fixing any type of lining, since they are easier and more convenient to work with, and their cost is much lower than metal profiles.
Post Reply